日本語 English 中文

MRP glossary TOP > Engineering Data Control > Manufacturing Lead Time

Manufacturing Lead Time

Manufacturing Lead Time

It is a period ranging from placing a Manufacturing Order (in order to manufacture one lower-level items such as products, assemblies, and parts) to completing them. It consists of the time during each process needed to manufacture items, in other words, the transportation time between process lead time and each process, which is used to calculate the lead time for manufactured items.

mrp_126-2.jpg
Related term: Lead Time

Reference:JIT Business Research Mr. Hirano Hiroyuki

Manufacturing Calendar | Engineering Data Control | Non-stocked Goods