MRP glossary TOP > Material Planning
Material Planning
- Activity Chain
- Allocation
- Available Stock
- B/M
- Bill of Materials
- Bill of Materials
- Bucket
- Calculating Fixed Lead Time
- Calculating Gross Requirements
- Calculating Lead Time
- Calculating Net Requirements
- Calculating Requirements
- Calculating Variable Lead Time
- Damper
- De-expedite
- De-expedite
- Delivery Date (Due Date)
- Demand Characteristics
- Dependent Demand
- Dependent Demand Item
- Economic Lot Size
- Economic Order Quantity
- EOQ
- Expedite
- Expedite
- Extraction
- Failure Rate
- Fixed Allocation
- Fixed Order Quantity
- Fixed Period Requirements
- FOQ
- FPR
- Full Pegging
- Gross Requirements
- Independent Demand
- Independent Demand Items
- Lead Time
- Lead Time
- Lead Time
- Lead Time Off-set
- Lead Time Off-set
- Level by Level
- Level Table
- LFL
- Lot for Lot
- Lot Sizing
- Lot Sizing
- Low Level Code
- Material Requirements Planning
- MRP
- MRP List
- Net Change
- Net Change
- Net Requirements
- Order
- Order
- Order Cancel
- Order Cancel
- Order Relationship
- Order Status
- Order Timing Damper
- P/M
- P/S
- Parent Order
- Pegged Requirements
- Physical Unit
- Planned Release Date
- PPB Method
- Product Structure
- Quantity Change Damper
- Recommendation
- Regeneration
- Regeneration
- Released Order
- Requirements
- Requirements Explosion
- Rounding of Fractions
- Rounding Unit
- Single Level Explosion
- Single Level Pegging
- Single Level Requirements Explosion
- Single Pegging
- Spare Allocation
- Surplus
- Upper-level Order
- Yield