日本語 English 中文

MRP glossary TOP > C > Constructive Issue

Constructive Issue

It is a method to handle the issue status on the ledger sheet, in which the items are regarded to have been taken out of a warehouse based on only the performance report without using issue slips. This is used as simpler method of Actual Issue using issue slips.

Related term: Constructive Receive/Issue
Antonyms: Issue

Reference:JIT Business Research Mr. Hirano Hiroyuki

Combined Bill of Materials | C | Constructive Receive