MRP glossary TOP > S > Shipping Control
Shipping Control
Shipping Control
Shipping Control is performed as follows: according to the progress of manufacturing products, the delivery date to customers is confirmed; the preparation for shipping is made; the instructions for shipping are made. The function is roughly divided into shipping planning and shipping inspection.
Shipping Control is performed as follows: according to the progress of manufacturing products, the delivery date to customers is confirmed; the preparation for shipping is made; the instructions for shipping are made. The function is roughly divided into shipping planning and shipping inspection.
![mrp_111-1.jpg](http://www.asprova.jp/mrp/glossary/en/assets_c/2011/09/mrp_111-1-thumb-385x93-1001.jpg)
Reference:JIT Business Research Mr. Hirano Hiroyuki