日本語 English 中文

MRP glossary TOP > Material Planning > Single Pegging

Single Pegging

Single Pegging, Single Level Pegging

It is a method to have relationship between a certain order and the oder of its one upper level, where it is impossible to know a product order directly from lower level orders. To know it, orders of one upper level of each one should be checked.

mrp_056.jpg

Reference:JIT Business Research Mr. Hirano Hiroyuki

Single Level Requirements Explosion | Material Planning | Spare Allocation