MRP glossary TOP > Material Planning > Full Pegging
Full Pegging
It is a method to maintain the relationship with the highest-level order in addition to the method of Single Pegging. In this case, the end items like products can be directly checked by each order.
Related term: Pegged Requirements
Antonyms: Single Pegging
Reference:JIT Business Research Mr. Hirano Hiroyuki