MRP glossary TOP > Inventory Control > Automatic Receive/Issue
Automatic Receive/Issue
Constructive Receive/Issue
To control the status of receiving/issuing from a warehouse, there are mainly two methods: one to use slips, and the other not to use them. Generally the former is called Receive/Issue, and the latter is called Constructive Receive/Issue. Automatic Receive/Issue refers to Constructive Receive/Issue, and is a method where without using actual slips, a lower-level item is automatically issued when the upper-level item is completed, and its upper-level item is received.
To control the status of receiving/issuing from a warehouse, there are mainly two methods: one to use slips, and the other not to use them. Generally the former is called Receive/Issue, and the latter is called Constructive Receive/Issue. Automatic Receive/Issue refers to Constructive Receive/Issue, and is a method where without using actual slips, a lower-level item is automatically issued when the upper-level item is completed, and its upper-level item is received.
Reference:JIT Business Research Mr. Hirano Hiroyuki