MRP glossary TOP > Manufacturing Planning and Process Controls > Slack Time Factor
Slack Time Factor
It is a factor used to sequence operations in the work scheduling. This method originates from the idea where work should be performed in the ascending order of slack according to the calculated the slack days of an order. The factor which such slack is reflected in is a slack time factor, and is expressed by the following formula:
Related term: Operation Sequencing, Total Days of Operations Remaining
Reference:JIT Business Research Mr. Hirano Hiroyuki
Set Capacity | Manufacturing Planning and Process Controls | Split Order