MRP glossary TOP > Cost Control > Internal Cost
Internal Cost
![mrp_150.jpg](http://www.asprova.jp/mrp/glossary/en/assets_c/2011/09/mrp_150-thumb-400x220-972.jpg)
Related term: Internal Cost and External Cost
Reference:JIT Business Research Mr. Hirano Hiroyuki
Indirect Material Cost | Cost Control | Internal Cost and External Cost
Asprova MRP is calculated on the memory requirement, allocate lead time at a high speed. Can achieve material arrangement Just in Time, which is impossible in other MRP system.
MRP glossary TOP > Cost Control > Internal Cost
Reference:JIT Business Research Mr. Hirano Hiroyuki
Indirect Material Cost | Cost Control | Internal Cost and External Cost