Manufacturing Process Control

seizou_zu.gif In Process Item PM(Produvtive Maintenance) Productive Maintenance MP Maintenance Prevention CM Corrective Maintenance PM(Preventive Maintenance) Preventive Maintenance BM Breakdown Maintenance Facility Maintenance Fixed Site Inspection Final Inspection Process Inspection Inspection Work in Process Order Splitting Lot Splitting Follow-up Control Dispatching Dispatching Order Release Total Number of Remaining Working Days Slack Time Factor Operation Sequencing Operation Order Release Planning Set Capacity Maximum Capacity Standard Capacity Process Capacity Capacity Capacity Adjustment Latest Start Date Earliest Start Date Leveling Leveling Load Loading Loading CRP Capacity Requirements Planning Alternative Process Bottleneck Process Final Process First Process Post-Process Pre-Process Line Line Layout Flow Shop Job Flow GT Shop Job Shop Job Shop Process Transportation Time between Processes Process Lead Time Manufacturing Lead Time Lead Time Split Order Operation Order Manufacturing Order Order Items for Maintenance Manufactured Goods Assemblies Manufactured Items Item Manufacturing Process Control
Work descriptions:
Manufacturing planning is usually handled by a master workman or each person in charge belonging to the planning or management section in each shop in the manufacturing division. Based on the production plan (large schedule plan), he/she explores the necessary constituent parts (middle schedule plan), which are sorted into internal ones or external. Then he/she prepares a schedule list (small schedule plan), allocates the worker(s) by dispatching, and provides directions for the actual work.
Problems:
Possible problems in the manufacturing process control system are as follows:
1. Due to improper standard time manufacturing plan is difficult to be practical.
2. The relationship between capacity and load is unclear, and thus it is difficult to sort parts into internal ones or external.
3. Since the person in charge of planning cannot grasp the progress status, some deliveries are delayed.
4. The performance data of work cannot be correctly grasped and thus be reflected on the plan.
Functions:
The manufacturing process control system has the functions of manufacturing plan and process control.
Manufacturing plan
For the manufactured item whose MRP is performed, the system performs process explosion, places load on each process, makes an arrangement considering its capacity, performs the sequence planning of equalized works, and then sends operating instructions to each shop.
Process control
The system receives the information on the progress status of issued orders, and prepares a report on the work progress status, operation result by process, and so on.

Reference:JIT Business Research Mr. Hirano Hiroyuki